Analisa biaya dan waktu pekerjaan kolom dengan metode penggunaan alat concrete bucket dan concrete pump (studi kasus : jembatan akses sungai gonyol) proyek pembangunan jalan tol Semarang-Demak seksi 2
In construction work, the right method is needed so that the implementation can take place effectively and efficiently. In this study, we would compare the column casting method using the concrete bucket method and the concrete pump method. The data was obtained through direct observation in the field related to time and cost issues.The conclusion that can be drawn is that the casting time of concret bucket is 9.371 hours and the unit price is Rp 1,002,668.31 / m3. While the casting time of concrete pump method is 2.632 hours and the unit price is Rp 972,937.28 / m3
Ketersediaan
JJ002.2021 | JJ 002 IMA a 2021 | PERPUS POLINES (TA) | Tersedia |
Informasi Detil
Judul Seri |
-
|
---|---|
No. Panggil |
JJ 002 IMA a 2021
|
Penerbit | Politeknik Negeri Semarang : Semarang., 2021 |
Deskripsi Fisik |
xiv, 88 hlm.: ill., 30 cm.
|
Bahasa |
Indonesia
|
ISBN/ISSN |
-
|
Klasifikasi |
NONE
|
Tipe Isi |
-
|
Tipe Media |
-
|
---|---|
Tipe Pembawa |
-
|
Edisi |
-
|
Subyek | |
Info Detil Spesifik |
-
|
Pernyataan Tanggungjawab |
IMAMAH Kiasatina Nur Sabrina; KIARA Harnowo
|
Versi lain/terkait
Tidak tersedia versi lain