No image available for this title

SKRIPSI

Analisa biaya dan waktu pekerjaan kolom dengan metode penggunaan alat concrete bucket dan concrete pump (studi kasus : jembatan akses sungai gonyol) proyek pembangunan jalan tol Semarang-Demak seksi 2



In construction work, the right method is needed so that the implementation can take place effectively and efficiently. In this study, we would compare the column casting method using the concrete bucket method and the concrete pump method. The data was obtained through direct observation in the field related to time and cost issues.The conclusion that can be drawn is that the casting time of concret bucket is 9.371 hours and the unit price is Rp 1,002,668.31 / m3. While the casting time of concrete pump method is 2.632 hours and the unit price is Rp 972,937.28 / m3


Ketersediaan

JJ002.2021JJ 002 IMA a 2021PERPUS POLINES (TA)Tersedia

Informasi Detil

Judul Seri
-
No. Panggil
JJ 002 IMA a 2021
Penerbit Politeknik Negeri Semarang : Semarang.,
Deskripsi Fisik
xiv, 88 hlm.: ill., 30 cm.
Bahasa
Indonesia
ISBN/ISSN
-
Klasifikasi
NONE
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subyek
Info Detil Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLCite this