Detail Cantuman
Pencarian Spesifik![No image available for this title](./images/default/image.png)
SKRIPSI
The Analysis of Clearance and Ports Equipment Toward Long Container Dwelling Time (case study : KPP Bea Cukai Tanjung Emas and Semarang Container Terminal)
The aim of this study is to examine the effect of clearance and port equipment on long container dwelling time both partially and simultaneously. The study utilized quantitative research method. Secondary data which used were monthly period data from January 2016 – March 2019. The data sources were from PT. Pelabuhan Indonesia III (Persero) Semarang Container Terminal and Tanjung Emas Custom and Excises. Regarding the use of period, the total data which used is thirty-nine months. The study explored with multiple linear regression statistical analysis. The t-Test result informed that clearance has significant effect on long container dwelling time with 4.828 in t-count and sign of 0.000. Meanwhile, the port equipment has result of -1.525 in t-counts and no significant effect in it with sign value of 0.136. The F-Test stated that both clearance and port equipment has significant effect simultaneously with f-count of 16.663 and sign value of 0.000.. From the result, suggestions that can be taken are conducting the FGD of INSW, add more equipment, avoid the breakdown equipment together with maintenance schedule, provide operator training, and benchmark to other port companies.
Ketersediaan
MB002.2019 | MB 002 ERI t 2019 C.1 | PERPUS POLINES (TA) | Tersedia |
Informasi Detil
Judul Seri |
-
|
---|---|
No. Panggil |
MB 002
|
Penerbit | Polines : Semarang., 2019 |
Deskripsi Fisik |
xvi, 96 hal.; 29 cm.
|
Bahasa |
INGGRIS
|
ISBN/ISSN |
-
|
Klasifikasi |
NONE
|
Tipe Isi |
-
|
Tipe Media |
-
|
---|---|
Tipe Pembawa |
-
|
Edisi |
-
|
Subyek |
-
|
Info Detil Spesifik |
-
|
Pernyataan Tanggungjawab |
ERITA, Utami
|
Versi lain/terkait
Tidak tersedia versi lain