No image available for this title

SKRIPSI

Pengaruh Kuantitas Bahan Baku, Jumlah Tenaga Kerja dan Lama Pengerjaan Terhadap Total Produksi Benang Open End pada PT. Apac Inti Corpora Semarang



This study aims to analyze the influence of raw material quantity, labor and

processing time toward production total of open end yarn at PT. Apac Inti

Corpora Semarang. The data used in this research are primary data and

secondary data. Secondary data in this research are the report of raw materail

quantity, labor, processing time and production total in 2014-2017 at Open End

Spinning Department PT. Apac Inti Corpora Semarang. Data collection method

used are observation, interview and documentation. The analysis technique used

are calssical assumption test, multiple linier regression, determination coefficient,

T test and F test. Based on the results of multiple regression analysis and F test

can be seen that quantity of raw material (X1), labor (X2) and processing time (X3)

influence to production total simultaneously.While the hypothesis testing using T

test refer, raw material quantity has a positive impact and significant to

production total, labor has a positive impact and significant to production total

and processing time has negative impact and significant to production total.R2 is

0,984 this means that 98,4% of the variation in production total can be explained

by the variable of raw material quantity, labor and processing time and the rest

(100%-98,4%=1,6%) is explained by the other variables.


Ketersediaan

MB028.2018MB 028 SIL p 2018 C.1PERPUS POLINES (TA)Tersedia

Informasi Detil

Judul Seri
-
No. Panggil
MB 028 SIL p 2018 C.1
Penerbit Polines : Semarang.,
Deskripsi Fisik
xv, 77 hal.; ilus.; 29 cm
Bahasa
Indonesia
ISBN/ISSN
-
Klasifikasi
NONE
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subyek
Info Detil Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaDetail XMLCite this